Towards Integrated Planning of Ground Processing of Aircraft at Airports
- Andrew Kisten Naicker
- oludolapo A. Olanrewaju
- Xinping Zhu
- Liwei Zheng
- Ke Tang
- Tianyu Huang
- Felix Mora-Camino
Civil Aviation Flight University of China, Chengdu, China, 2Durban University of Technology, Durban, South · Africa, 3Universidade Federal Fluminense, Niteroi, Brazil, 4ENAC, Toulouse, France.
- Evento
- XXII SITRAER – Brasília, DF, Brasil, 22 a 24 de outubro de 2025
- Volume
- Anais do XXII Simpósio de Transporte Aéreo – SITRAER 2025 · ISBN 978-65-272-2024-4 · DOI 10.29327/9786527220244
- Editora
- Even3 Publicações
- Editores
- Fabiana Serra de Arruda, Camila Lucena, Giovanna Miceli Ronzani Borille, Evandro José da Silva
Abstract
In this article, is considered the management of aircraft at airports, at arrival, parking and departure. This management is composed of different subprocesses tackled collaboratively by different airport stakeholders. To these subprocesses are attached different decision problems which are interdependent in time and space. Among these interdependencies is studied more particularly at the level of daily planning. the one between the Aircraft Gate Assignment Problem and the Ground Handling Resource Allocation Problem which have been until today treated separately. The opportunity to build a global framework to cope simultaneously, and more efficiently, with these two problems is considered particularly, given the increasing flexibility of ground handling operations resulting from automation. The case of long-haul flights associated with dedicated apron/gate areas is particularly motivating.
Keywords: Integrated Ground Operations; Airport Ground Handling; Aircraft Gate Assignment; Scheduling; Optimization